A map of the subsea cables is seen at Driftwood State Beach where the cables are connected to the wave energy test site arrive on land and connect to land cables in Newport, Ore., Friday, Aug. 23, 2024. (AP Photo/Craig Mitchelldyer)

News, Photo and Web Search